Project: Georgetown Bypass

Summary:

The Georgetown Bypass provides an alternative route south of the congested city branching from US-460 two miles west of the city center and reconnects to US-460 1.5 miles west of the city center. It is also known as the US-460 Bypass and McClelland Circle.

Characteristics and Setting:

Classification/Type
Bypass
Transportation Mode
Highway
Average Annual Daily Traffic
42,516
Length (mi)
5.50
Economic Distress
1.33
Population Density (ppl/sq mi)
145
Population Growth Rate (%)
0.04
Employment Growth Rate (%)
0.01
Market Size
240,991
Airport Travel Distance (mi)
28.3500
Topography
14

Geography

Region
Southeast
State
KY
County
Scott
City
Georgetown
Urban/Class Level
Metro
Local Area
N/A
Impact Area
County
Transportation System
Highway

Timing

Initial Study Date
1969
Post Construction Study Date
1999
Construction Start Date
1991
Construction End Date
1994
Months Duration
N/A

Costs

Project Year of Expenditure (YOE)
1994
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
24,440,000
Actual Cost (current $)
39,401,170

Pre/Post Conditions:

NOTE: All pre/post dollar values are in 2013$

Select a region to display the conditions for that region:

Local

Measure Pre project Post project Change % Change
Personal Income Per Capita 0 23,579.60 0 N/A
Economic Distress 0.76 1.08 0.31 0.41%
Number of Jobs 1,625.31 9,198 7,572.69 4.66%
Business Sales (in $M's) 0 0 0 N/A
Tax Revenue (in $M's) 0 0 0 N/A
Population 11,414 11,414 0 N/A
Property Value (median house value) 0 0 0 N/A
Density (ppl/sq mi) 0 0 0 N/A

County(ies)

Measure Pre project Post project Change % Change
Personal Income Per Capita 130,348 35,309.20 -95,038.80 -0.73%
Economic Distress 0.80 0.48 -0.33 -0.41%
Number of Jobs 14,855 27,697 12,842 0.86%
Business Sales (in $M's) 0 0 0 N/A
Tax Revenue (in $M's) 0 0 0 N/A
Population 23,943 32,048 8,105 0.34%
Property Value (median house value) 0 0 0 N/A
Density (ppl/sq mi) 61.99 112.56 50.57 0.82%

State

Measure Pre project Post project Change % Change
Personal Income Per Capita 115,437 29,417.40 -86,019.60 -0.75%
Economic Distress 1.09 1.10 0.01 0.01%
Number of Jobs 1,918,470 2,290,790 372,320 0.19%
Business Sales (in $M's) 0 0 0 N/A
Tax Revenue (in $M's) 0 0 0 N/A
Population 3,694,050 4,018,050 324,000 0.09%
Property Value (median house value) 0 0 0 N/A
Density (ppl/sq mi) 80.50 101.14 20.64 0.26%

County Impacts

NOTE: All impact dollar values are in 2013$

Measure Direct Indirect Total
Jobs 1,376.00 124.00 1,500.00
Income (in $M's) 85.31 7.69 93.00
Output (in $M's) 650.29 58.60 708.89

Case Location:

View Map

Narrative:

Georgetown Bypass

1.0 Synopsis

The Georgetown Bypass provides an alternative route to US 460 south of the congested center of Georgetown, KY. Construction of the bypass opened up new land for residential, retail and industrial development spurred by the development of a Toyota manufacturing plant. The bypass helped facilitate the city and county's steady growth over the past 20 years. The project is not responsible for any net job creation.

2.0 Background

2.1 Location & Transportation Connections

Georgetown, located in Scott County, KY, is approximately 20 miles north of Lexington, 80 miles east of Louisville, and 70 miles south of Cincinnati. Georgetown is in the Blue Grass Area Development District of KY, and falls under the jurisdiction of the State Highway District 7.

US 460 begins in Frankfort and travels east through Georgetown, Paris, Mount Sterling, West Liberty, Saylersville, Prestonsburg, and Pikeville before exiting into Virginia near Mouthcard, Kentucky. In Georgetown, the four-lane, divided US 460 bypass spans 5.5 miles around the southern edge of town. It branches from US 460 two miles west of the city center and reconnects to US 460 1.5 miles west of the city center. The Georgetown Bypass is also known as the US 460 Bypass and McClelland Circle, and connects seamlessly into Cherry Blossom Way, which provides direct access to the Toyota manufacturing plant three miles to the north.

Limited commercial air service is available through Lexington's Blue Grass Airport. Cincinnati/Northern Kentucky International Airport and Louisville International Airport both provide air service to destinations within the United States and internationally.

2.2 Community Character & Project Context

As a bedroom community to Lexington, 15 miles to the south along I-75, Georgetown had a small town character before the successful recruitment of the Toyota manufacturing plant in the mid-1980's. Toyota located in Georgetown due to I-75 access immediately adjacent to the plant, I-64 connections within 10 miles, a sufficient water and sewer system, rail access at the plant, low-cost power, and an educated, competitive and available workforce. While the bypass was planned, its development was far from certain at the time of Toyota's location announcement. Since the Toyota plant opened, the County's population has doubled from 23,000 to 45,000.

A notable number of Georgetown residents commute south to Lexington and west to Frankfort (the state capital 20 miles to the west). These commuting patterns affected the community's desire for improved connectivity around the city center and eliminated potential bottlenecks.

3.0 Project Description & Motives

The Georgetown Bypass project consists of a four-lane, partially controlled access facility designed to facilitate east-west through traffic movements around the Georgetown city center. The project also included an above-grade rail crossing. The project was built to address several traffic flow issues, including:

  • Improve Georgetown Industrial Park Access : Prospective companies continually expressed concern about the congested access via Lemons Mill Road (southeast of the city center) for both truck traffic and employees.
  • Accommodate Shift-Change Traffic Peaks:  Similarly, industry shift changes congested both Lemons Mill Road and US-25 (the major north-south arterial).
  • Eliminate Backups due to Railroad Crossings: Peak period train crossings brought Georgetown's major arterial traffic to a standstill in several directions.
  • Improve Access to Georgetown College and John Graves Ford Memorial Hospital: Access for hospital patients, staff & emergency vehicles were especially constrained during peak periods and/or train crossings.
  • Accommodate Future Retail Development: Officials and residents feared that the planned Kroger and Wal-Mart shopping complexes would further exacerbate city traffic congestion.

Led by the Georgetown-Scott County Citizens Transportation Advisory Committee, residents, business leaders, proprietors and local officials strongly supported the project and its location, despite the fact that it did not directly serve the Toyota Plant. Further, the Planning Commission fully supported the project because it furthered the region's land use goals.

The cost of the proposed Georgetown bypass was estimated at $18.0 (1985 $) million. Ultimately, the 5.5 mile bypass cost $24.4 million by its completion, and opened in 1994. Plans call for the eventual extension of the bypass to the north.

4.0 Project Impacts

4.1 Transportation Impacts
4.2 Demographic, Economic & Land Use Impacts

The bypass was instrumental in supporting a major land use shift initiated by the Toyota Plant. To supply the plant, businesses serving the Toyota facility located to the east and north of the city center and now use the bypass. Additionally, major retail stores, including Wal-Mart and a Kroger Grocery, located along the bypass, followed by several large chain restaurants. Nearby interstate access further supported this growth in retail and restaurant business. As a result, small retail stores in the downtown closed and were replaced by professional services including banks, law firms, accounting firms, etc.

Property taxes are relatively low in Scott County. The county generates revenue through an Occupational Tax, which includes a 1% payroll tax and a profit tax. Between 1986 and 1996, the Occupational Tax revenues have increased from $1.1 million to $7.5 million, and peaked at $18.7 million in 2005. In 2008, these taxes fell to $16.9 million and are anticipated to fall in 2009 to under $12.0 million due to the effects of the 2009 economic recession on the automobile industry in general, and the Toyota Plant specifically. The bypass is recognized as a contributing factor in the county's growth over the past 15-years.

5.0 Non-Transportation Factors

Jobs at the Toyota Plant (and related businesses) created new housing demand. The bypass facilitated a significant shift in land use at the edge of the city from low value tobacco farmland to industrial and/or residential land uses. The County Planning and Zoning department has worked to facilitate the transition.

Much residential infill has occurred between the bypass and the city center. Spurred by the Toyota-related jobs and the city's proximity to Lexington, the bypass helped accommodate the region's rising demand for new housing. This resulted in property values increasing 10-20-times the previous 1980 values, with current values at $200,000-$250,000/acre

The community has not succeeded in diversifying its industrial base away from the auto manufacturing sector. The bypass has had no effect in attracting new manufacturing industries or businesses unrelated to the Toyota plant.

6.0 Resources

6.1 Citations
  1. Project Planning Report, Georgetown Bypass”; KY Transportation Cabinet, Department of Highways, Division of Planning, September 1986
  2. Analysis of the Economic Clusters in the Bluegrass Area Development District, 2009”; The Bluegrass Area Development District (BGADD)
  3. http://www.bgadd.org/
  4. http://www.gscplanning.com/
  5. http://www.gtown.org/default.asp
  6. http://www.kentuckyroads.com/scott_county/
  7. http://www.transportation.ky.gov/D7/default.asp
  8. http://maps.google.com/maps
6.2 Interviews

Organization

Kentucky Transportation Cabinet

Kentucky Transportation Cabinet -Highway District #7

Bluegrass Area Development District

Scott County

Footnotes

Case Study Developed by Wilbur Smith Associates